{"id":21,"date":"2026-08-31T18:01:24","date_gmt":"2026-08-31T10:01:24","guid":{"rendered":"http:\/\/wh-nu7wehbv22kcbyp04h6.my3w.com\/?page_id=21"},"modified":"2026-08-31T18:01:24","modified_gmt":"2026-08-31T10:01:24","slug":"sq-quality-control","status":"publish","type":"page","link":"https:\/\/www.ebestpcba.com\/index.php\/sq-quality-control\/","title":{"rendered":"PCB &#038; PCBA Quality Control and Inspection"},"content":{"rendered":"\n<main class=\"qc-page\" id=\"main-content\">\r\n<section class=\"qc-hero\">\r\n<div class=\"wrap qc-hero-grid\">\r\n<div>\r\n<div class=\"qc-crumb\"><a href=\"index.html\">Home<\/a> \/ <a href=\"quality.html\">Quality<\/a> \/ Quality Control<\/div>\r\n<div class=\"qc-kicker\">Quality Requirements Before Production<\/div>\r\n<h1>PCB &amp; PCBA Quality Inspection From Incoming Materials to Shipment<\/h1>\r\n<p class=\"qc-lead\">Before quotation, send your production files, inspection requirements, acceptance criteria and required records. EBest PCBA will review the applicable checks for incoming materials, first articles, production, testing and shipment, and confirm the included requirements in the quotation.<\/p>\r\n<div class=\"qc-actions\"><a class=\"btn btn-red\" href=\"contact.html#project-form\">Send Gerber &amp; BOM<\/a><a class=\"tlink\" href=\"contact.html#project-form\">Discuss Inspection Requirements \u2192<\/a><\/div>\r\n<div class=\"qc-proof\"><span>ISO9001<\/span><span>IATF16949<\/span><span>ISO13485<\/span><span>AS9100D<\/span><\/div>\r\n<\/div>\r\n<figure class=\"qc-visual\"><img loading=\"lazy\" alt=\"AOI operator reviewing assembled PCB inspection results at a workstation\" decoding=\"async\" height=\"789\" src=\"assets\/images\/quality-control\/quality-control-hero-aoi-inspection.jpg\" width=\"1162\"\/><figcaption>We select the inspection methods according to your board design, component packages and agreed acceptance criteria.<\/figcaption><\/figure>\r\n<\/div>\r\n<\/section>\r\n<section class=\"qc-section qc-mist\" id=\"control-gates\">\r\n<div class=\"wrap\">\r\n<div class=\"qc-head\"><div class=\"qc-eyebrow\">Quality Checks During Production<\/div><h2>5 Quality Checks From Incoming Materials to Shipment<\/h2><p>We review the required checks for incoming materials, first articles, production, inspection and shipment. The quotation will state which checks apply to your order based on your files and quality requirements.<\/p><\/div>\r\n<div class=\"qc-gates\">\r\n<article class=\"qc-gate\"><span class=\"qc-num\">01<\/span><h3>Incoming Inspection<\/h3><p>Before production, we check the identity, condition and required documents for the PCBs, components and materials specified for your order.<\/p><\/article>\r\n<article class=\"qc-gate\"><span class=\"qc-num\">02<\/span><h3>First Article Check<\/h3><p>When first-article approval is required, we check placement, polarity, orientation, workmanship and other agreed build details before the remaining batch continues.<\/p><\/article>\r\n<article class=\"qc-gate\"><span class=\"qc-num\">03<\/span><h3>In-Process Inspection<\/h3><p>During PCB fabrication and PCBA assembly, we perform the agreed inspections to identify issues before they affect additional units.<\/p><\/article>\r\n<article class=\"qc-gate\"><span class=\"qc-num\">04<\/span><h3>Inspection and Testing<\/h3><p>We use the visual, SPI, AOI, X-ray, electrical or functional checks included in the quotation when they are suitable for the product and the required test inputs are available.<\/p><\/article>\r\n<article class=\"qc-gate\"><span class=\"qc-num\">05<\/span><h3>Shipment Check<\/h3><p>Before shipment, we verify the finished quantity, workmanship, completed tests, packaging and required delivery records.<\/p><\/article>\r\n<\/div>\r\n<p class=\"qc-note\">The quotation will confirm the required inspection and test methods based on the PCB construction, component packages, assembly process, test access and your acceptance criteria.<\/p>\r\n<\/div>\r\n<\/section>\r\n<section class=\"qc-section\">\r\n<div class=\"wrap qc-risk-grid\">\r\n<div>\r\n<div class=\"qc-head\"><div class=\"qc-eyebrow\">Inspection Method Selection<\/div><h2>How We Select Inspection and Test Methods for Your PCB or PCBA<\/h2><p>Tell us which defects, acceptance criteria and result records are important when you send your files for review. We review the board design, component packages and test access to confirm the suitable inspection or test methods.<\/p><\/div>\r\n<div aria-label=\"Quality risk and inspection method matrix\" class=\"qc-risk-table\" role=\"table\">\r\n<div class=\"qc-risk-row qc-th\" role=\"row\"><div>Product feature<\/div><div>Inspection or test method<\/div><div>Result or record<\/div><\/div>\r\n<div class=\"qc-risk-row\" role=\"row\"><div><b>Solder paste and fine-pitch components<\/b><\/div><div>Stencil and paste checks, with SPI when agreed for SMT assembly<\/div><div>Inspection result and any recorded issue<\/div><\/div>\r\n<div class=\"qc-risk-row\" role=\"row\"><div><b>Polarity, offset and visible joints<\/b><\/div><div>First-article check, visual inspection and AOI when applicable<\/div><div>Inspection result and action taken for any issue<\/div><\/div>\r\n<div class=\"qc-risk-row\" role=\"row\"><div><b>BGA and hidden solder joints<\/b><\/div><div>X-ray inspection when required by the package type or customer specification<\/div><div>X-ray result in the agreed record format<\/div><\/div>\r\n<div class=\"qc-risk-row\" role=\"row\"><div><b>Electrical and functional behavior<\/b><\/div><div>ICT, FCT or a customer-defined test method when the required test inputs are available<\/div><div>Pass\/fail result in the agreed format<\/div><\/div>\r\n<\/div>\r\n<\/div>\r\n<figure class=\"qc-risk-image\"><img loading=\"lazy\" alt=\"Operator reviewing PCBA AOI inspection results\" decoding=\"async\" height=\"734\" src=\"assets\/images\/services\/pcba-assembly\/pcba-assembly-aoi-inspection-real.jpg\" width=\"1100\"\/><span>AOI checks component placement, polarity and visible solder-joint conditions when it is included for the assembly.<\/span><\/figure>\r\n<\/div>\r\n<\/section>\r\n<section class=\"qc-section qc-mist\">\r\n<div class=\"wrap\">\r\n<div class=\"qc-head\"><div class=\"qc-eyebrow\">Inspection and Traceability Records<\/div><h2>Quality Records Available for Your PCB or PCBA Order<\/h2><p>Send us your requirements for inspection, test and traceability records, including the file format, retention period and delivery timing. We will confirm what can be provided in the quotation.<\/p><\/div>\r\n<div class=\"qc-evidence-grid\">\r\n<article class=\"qc-evidence\"><img loading=\"lazy\" alt=\"PCBA X-ray inspection workstation for hidden solder joints\" decoding=\"async\" height=\"734\" src=\"assets\/images\/services\/pcba-assembly\/pcba-assembly-xray-inspection-real.jpg\" width=\"1100\"\/><div class=\"qc-evidence-body\"><h3>Inspection and Test Records<\/h3><p>Depending on the quotation, available records may include first-article, AOI, X-ray, visual inspection or test results.<\/p><\/div><\/article>\r\n<article class=\"qc-evidence\"><img loading=\"lazy\" alt=\"Quality engineer scanning a PCBA into the traceability system\" decoding=\"async\" height=\"930\" src=\"assets\/images\/home\/landing-v3\/traceable-build-records-mes.jpg\" width=\"1240\"\/><div class=\"qc-evidence-body\"><h3>Batch and Serial Number Traceability<\/h3><p>When required, batch or serial numbers can link material or component information with production status and inspection records for your order.<\/p><\/div><\/article>\r\n<article class=\"qc-evidence\"><img loading=\"lazy\" alt=\"PCBA testing and inspection process in the EBest PCBA factory\" decoding=\"async\" height=\"800\" src=\"assets\/images\/home\/landing-v3\/testing-inspection.jpg\" width=\"1200\"\/><div class=\"qc-evidence-body\"><h3>Shipment Records<\/h3><p>Before shipment, we verify the inspection and test status, finished quantity, packaging and the delivery records agreed for the order.<\/p><\/div><\/article>\r\n<\/div>\r\n<\/div>\r\n<\/section>\r\n<section class=\"qc-section qc-dark\">\r\n<div class=\"wrap qc-ncr\">\r\n<div class=\"qc-head\"><div class=\"qc-eyebrow\">When a Quality Issue Is Found<\/div><h2>How We Handle Materials or Assemblies That Do Not Meet Requirements<\/h2><p>We stop the affected work, separate the affected materials or assemblies, record the issue and confirm the required action before production continues.<\/p><\/div>\r\n<img loading=\"lazy\" alt=\"EBest PCBA staff reviewing quality inspection records\" decoding=\"async\" height=\"800\" src=\"assets\/images\/about\/esg-quality-inspection-record-review.jpg\" width=\"1200\"\/>\r\n<div class=\"qc-steps\">\r\n<div class=\"qc-step\"><span>01<\/span><div><b>Identify and Separate Affected Items<\/b><p>We record the issue and separate the affected materials or assemblies from other work.<\/p><\/div><\/div>\r\n<div class=\"qc-step\"><span>02<\/span><div><b>Check the Affected Quantity and Requirement<\/b><p>We identify the affected lot or quantity, the production stage and the requirement that was not met.<\/p><\/div><\/div>\r\n<div class=\"qc-step\"><span>03<\/span><div><b>Confirm the Required Action<\/b><p>If deviation approval, rework, replacement or another customer decision is required, we ask for written confirmation before proceeding.<\/p><\/div><\/div>\r\n<div class=\"qc-step\"><span>04<\/span><div><b>Complete the Action and Verify the Result<\/b><p>We complete the agreed action, inspect the result and record the outcome before work resumes or the products are prepared for shipment.<\/p><\/div><\/div>\r\n<\/div>\r\n<\/div>\r\n<\/section>\r\n<section class=\"qc-section\">\r\n<div class=\"wrap qc-plan\">\r\n<div class=\"qc-head\"><div class=\"qc-eyebrow\">Quality Requirements for Quotation<\/div><h2>Send Your Quality Requirements for Review<\/h2><p>Send your production files, acceptance criteria, critical features, test requirements and required records. EBest PCBA will check what is complete, identify missing information and list the included inspections, tests and records in the quotation.<\/p><div class=\"qc-actions\"><a class=\"btn btn-red\" href=\"contact.html#project-form\">Request a Quality Review<\/a><a class=\"tlink\" href=\"equipment-inspection.html\">Review inspection equipment \u2192<\/a><\/div><\/div>\r\n<div class=\"qc-plan-list\">\r\n<div class=\"qc-plan-item\"><b>Product files<\/b><span>Gerber or ODB++, BOM, drawings and assembly data.<\/span><\/div>\r\n<div class=\"qc-plan-item\"><b>Acceptance criteria<\/b><span>Applicable IPC class, workmanship limits and customer-specific requirements.<\/span><\/div>\r\n<div class=\"qc-plan-item\"><b>Critical Features<\/b><span>Identify fine-pitch components, BGA packages, high-current areas, controlled impedance or other characteristics that require specific checks.<\/span><\/div>\r\n<div class=\"qc-plan-item\"><b>Test inputs<\/b><span>Test method, fixtures, firmware, procedures and pass\/fail limits where required.<\/span><\/div>\r\n<div class=\"qc-plan-item\"><b>Traceability Requirements<\/b><span>Required lot or serial identifiers, related records, file format and retention period.<\/span><\/div>\r\n<div class=\"qc-plan-item\"><b>Required Delivery Records<\/b><span>Inspection reports, test results, photos or other records that must be supplied with the order.<\/span><\/div>\r\n<\/div>\r\n<\/div>\r\n<\/section>\r\n<section class=\"qc-cta\">\r\n<div class=\"wrap qc-cta-inner\"><div><h2>Send Your Files for a Quality Requirements Review<\/h2><p>Send your Gerber or ODB++, BOM, drawings, acceptance criteria and test requirements. We will review the files, identify missing information and confirm the included inspections, tests and records in the quotation.<\/p><\/div><div class=\"qc-cta-actions\"><a class=\"btn btn-red\" href=\"contact.html#project-form\">Send Project Files<\/a><a class=\"btn btn-ghost\" href=\"contact.html\">Discuss Quality Requirements<\/a><\/div><\/div>\r\n<\/section>\r\n<section class=\"qc-faq\">\r\n<div class=\"wrap faqwrap\">\r\n<div class=\"eyebrow\"><span class=\"bull\"><\/span>Frequently Asked Questions<\/div>\r\n<h2 class=\"sec\">PCB &amp; PCBA Quality Control Questions<\/h2>\r\n<details class=\"faq\"><summary>Does EBest PCBA provide quality control for PCB manufacturing and PCBA assembly?<\/summary><div>Yes. We review quality requirements for PCB fabrication, incoming materials, first articles, PCBA assembly, testing and final inspection. The quotation will state which checks and records are included for your order.<\/div><\/details>\r\n<details class=\"faq\"><summary>Can inspection requirements be defined during quotation review?<\/summary><div>Yes. Send your files, acceptance criteria, critical features and test requirements with your quotation request. We will confirm the required inspection methods and tell you if any information is missing.<\/div><\/details>\r\n<details class=\"faq\"><summary>Do you provide AOI and X-ray inspection?<\/summary><div>Yes. AOI or X-ray can be included when suitable for the board design, component packages and inspection requirements. The quotation will confirm the inspection areas, sampling and acceptance criteria.<\/div><\/details>\r\n<details class=\"faq\"><summary>What quality records can be provided?<\/summary><div>Available records may include incoming inspection, first-article, AOI, X-ray, electrical or functional test, final inspection and traceability information. Tell us the required format, retention period and delivery timing with your quotation request so we can confirm availability.<\/div><\/details>\r\n<details class=\"faq\"><summary>How are nonconforming products handled?<\/summary><div>We identify and separate the affected materials or assemblies, record the issue and check the affected quantity. If customer approval is required, we request it before completing the agreed action and verifying the result.<\/div><\/details>\r\n<details class=\"faq\"><summary>Can production lots and materials be traced?<\/summary><div>Yes, when the required identifiers and records are agreed for the quotation. Lot or serial identifiers can be linked to material or component information, production status and inspection records, with the retention period confirmed for the order.<\/div><\/details>\r\n<details class=\"faq\"><summary>Can you follow customer-specific acceptance criteria?<\/summary><div>Yes. Send your workmanship, inspection, test and reporting requirements with your quotation request. We will review technical feasibility and confirm the accepted requirements in writing before production.<\/div><\/details>\r\n<details class=\"faq\"><summary>Can I request an NDA before sending project files?<\/summary><div>Yes. You can request an NDA before sharing Gerber, BOM, drawings, test documents or other confidential project information.<\/div><\/details>\r\n<\/div>\r\n<\/section>\r\n<\/main>\n","protected":false},"excerpt":{"rendered":"<p>Home \/ Quality \/ Quality Control Quality Requirements B [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"eb_section":[2],"class_list":["post-21","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/pages\/21","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/comments?post=21"}],"version-history":[{"count":1,"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/pages\/21\/revisions"}],"predecessor-version":[{"id":71,"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/pages\/21\/revisions\/71"}],"wp:attachment":[{"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/media?parent=21"}],"wp:term":[{"taxonomy":"eb_section","embeddable":true,"href":"https:\/\/www.ebestpcba.com\/index.php\/wp-json\/wp\/v2\/eb_section?post=21"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}