Fine-Pitch Placement
01005 / BGA reviewPlacement accuracy, feeder plan, component mix and board support are confirmed from the actual files.
Send your Gerber files, BOM, and placement data. We will check the SMT/THT process, inspection, testing, and traceability needs before quoting.
We aim to reply within 24 hours. Lead time, capacity, testing, and acceptance criteria are confirmed after we check your files.
Use these figures for a first check. Actual output and lead time depend on your board, components, quantity, and test needs.
Use this table to see whether your SMT, THT, BGA, inspection, testing, and traceability needs are within our stated capabilities.
| Review Item | Standard Capability | Project Requirements |
|---|---|---|
| Build model | Full-turnkey, partial-turnkey or consigned material. | BOM ownership, approved sources, shortages, excess material and incoming inspection responsibility. |
| Volume route | No MOQ; prototype, pilot and repeat builds across the published 1 pc to 100K+ range. | Panel format, line loading, material status, inspection plan and schedule. |
| Assembly process | Single- and double-sided SMT, THT and mixed-technology assembly. | Process sequence, heat-sensitive parts, hand operations, selective soldering and cleaning. |
| Component window | 01005 placement; 0.4 mm BGA is the standard public production reference. | Land pattern, stencil strategy, component data, warpage, paste selection and X-ray route. |
| Board format | Long-format boards up to 1,200 mm can be processed, depending on board design and process requirements. | Board width, thickness, tooling rails, panel support, conveyor path, fiducials and depaneling. |
| Assembly standard | Published IPC Class 2/3 support. | Applicable revision, workmanship class, customer drawings, deviations and acceptance criteria. |
| Inspection | 3D SPI, 3D AOI, first article inspection and X-ray for hidden joints as specified. | Coverage, sampling, measurement limits, defect disposition and report deliverables. |
| Testing and finish | Available services include ICT, functional testing, firmware loading, serialization, and conformal coating for boards up to 700 × 400 mm. | Test method, fixture, software, limits, coating keep-outs, cure route and ownership. |
| Traceability | Material and process records retained for 15 years on supported programs. | Required record fields, customer-facing reports, serial structure and retrieval route. |
Placement accuracy, feeder plan, component mix and board support are confirmed from the actual files.
SPI and AOI help verify paste, placement, polarity and visible solder conditions before release.
X-ray is applied where solder joints cannot be fully confirmed by optical inspection.
Project-defined tests are confirmed with fixtures, software, limits and outgoing records.
Gerber / ODB++, BOM, centroid and drawings.
Turnkey, partial-turnkey or consigned model.
Stencil, placement, reflow and hand operations.
SPI, AOI, X-ray and first article evidence.
ICT, FCT, programming or customer-defined route.
Records, traceability and outgoing acceptance.
For supported projects, material and process records can be kept for 15 years. Tell us which records and compliance documents you need before production.
Review quality and traceabilityApproved source, lot, date code and receiving status where included in the program.
Records can include the program, production line, reflow profile, and inspection steps used for the order.
SPI, AOI, X-ray, first-article or test records according to the defined coverage.
Work order, serialization, disposition and outgoing records tied to the accepted product route.
These are representative capability profiles, not customer case studies or guaranteed outcomes. Final process and acceptance rules follow review of the actual files.
Stable BOM control, documented changes, inspection records and repeat-build discipline become the primary release concerns.
Stencil, placement, reflow, hidden-joint inspection and component risk need to be reviewed as one process window.
SMT and through-hole assembly combines automated and manual processes, including selective soldering, component polarity checks, mechanical support, and functional testing.
Electrical tests, firmware loading, fixtures, limits and customer-defined acceptance rules are confirmed before release.
We can start with partial files. Production starts only after the complete file set is approved.
Gerber or ODB++, drill, stack-up and panel information.
BOM, pick-and-place file, assembly drawing and special process notes.
Prototype, pilot or repeat quantity, target schedule and delivery expectations.
IPC class, inspection, testing, traceability, coating, serialization and reports.
Use the related pages to move from commercial scope to manufacturing, inspection and compliance evidence.
Review build models, quotation scope and production handoffs.
Open service page → EQUIPMENTConnect SPI, AOI, X-ray, ICT and FCT claims with the inspection route.
Review equipment → QUALITYConfirm who approves changes, which inspections are completed, which records are retained and who authorizes shipment.
Review quality system → COMPLIANCEReview available certification and supplier-evaluation information.
Review compliance →Send Gerber or ODB++, BOM, placement data, quantities and test requirements. Partial information is enough to start identifying open questions.
Final capability and acceptance decisions are based on the actual manufacturing package.