Before you commit production
A PCBA Quote with Clear Cost, Lead-Time, and Approval Items
A reliable PCBA quote should make more than the price clear. DFM findings, BOM risks, lead time, inspection and test scope, and any items awaiting your approval should be identified before production starts, reducing unexpected changes later.
We can start with incomplete files, but production requires a complete and approved file set.Missing MPNs, generic BOM descriptions, open test questions and uncertain quantities are recorded as review items instead of silently assumed.
View the DFM report structure →
01DFM action listThe published 270+ fabrication and assembly checks ranked before release.
02BOM risk reviewLifecycle, availability, package and alternate-part decisions.
03Itemized quotationPCB, components, assembly, test, NRE and shipping shown separately.
04Confirmed scheduleMaterial and engineering gates identified instead of hidden inside one date.
05Inspection and test planSPI, AOI, X-Ray, first article and project-specific test scope.
06Open approval recordAlternates, deviations and customer-controlled parts stay visible.