Use a revision-controlled change process that identifies affected PCB data, BOM lines, firmware, drawings, tooling, inventory and test instructions. The release should state the effective build or date and disposition of old material. Before a repeat order, confirm that the requested revision and approved deviations still apply rather than relying only on the previous purchase order.
Use this answer in your project review
Save or share this page with your engineering and purchasing team. Final manufacturing conditions are confirmed after the released project files are reviewed.
