Can prototype and volume production use the same process?
Yes, but not necessarily with an identical production route. Technical requirements may remain the same, while tooling, panel utilization, material purchasing,…
Read answer →FAQ category
Yes, but not necessarily with an identical production route. Technical requirements may remain the same, while tooling, panel utilization, material purchasing,…
Read answer →Repeat orders should be linked to the approved product revision, BOM, fabrication data, process requirements and any accepted deviations. Material date codes, l…
Read answer →The right prototype quantity depends on design maturity, test coverage, destructive testing, certification samples and the number of stakeholders who need units…
Read answer →A new product introduction build establishes and reviews the manufacturing process before routine volume production. It can include DFM closure, material verifi…
Read answer →Approve the PCB revision, BOM, alternates, assembly drawing, firmware, test method, workmanship criteria, sample result and any deviations before volume release…
Read answer →A golden sample can provide a physical reference for appearance, assembly orientation or functional behavior when its revision and approval status are controlle…
Read answer →Use a revision-controlled change process that identifies affected PCB data, BOM lines, firmware, drawings, tooling, inventory and test instructions. The release…
Read answer →Yes, but scale-up should review panel efficiency, material purchasing, component availability, tooling, process capability, inspection sampling, test capacity a…
Read answer →