Yes, but not necessarily with an identical production route. Technical requirements may remain the same, while tooling, panel utilization, material purchasing, test strategy and process controls can change with volume. Reviewing the transition early prevents prototype decisions from creating avoidable cost or control problems later.
Use this answer in your project review
Save or share this page with your engineering and purchasing team. Final manufacturing conditions are confirmed after the released project files are reviewed.
