Skip to content

Prototype to Volume Production

What should be approved before mass production starts?

Approve the PCB revision, BOM,…

EBest PCBA Engineering Team

Approve the PCB revision, BOM, alternates, assembly drawing, firmware, test method, workmanship criteria, sample result and any deviations before volume release. Confirm material status, tooling and delivery plan as well. A documented release package prevents a successful prototype from being followed by production against a different input set.

Use this answer in your project review

Save or share this page with your engineering and purchasing team. Final manufacturing conditions are confirmed after the released project files are reviewed.

Send Files for Review